Product detail
| Formwork Accessory | Template System、Supporting System、Fastening System、Accessory System |
| Size | Standard Size |
| Material | Aluminium |
| Application | concrete formwork |
| After-sale Service | Online Technical Support |
| Usage | concrete formwork |
| Feature | Easily Assembled, Reusable, adjustable size |
| Design Style | Modern |
| Project Solution Capability | 3D model design |
| Warranty | More Than 5 Years |
Product Introduction
Modular Vertical Aluminum Formwork System Easy Installation Adjustable Column & Shear Wall for Modern Concrete Construction
Modern Modular Aluminum Panel Formwork System for Construction House Column Wall Slab for Concrete Formwork Durable Lightweight
Modern Design Easy Assembly Aluminum Building Concrete Formwork System Efficient Construction Solution
Modern 3D Model Design for Aluminium Formwork Building Material Construction Concrete
Modern Designed Monolithic Concrete Structure Aluminum Formwork Assembled Work Table for Building Houses
Product Display
Product advantages
Advantages of Aluminum Alloy Formwork Construction
Simple Assembly and High Construction EfficiencyAluminum alloy formworks are the lightest among current metal formworks, A single worker-can easily move, install, dismantle, and transport them, The assembly is straightforwardaseach piece of fomwork and componentis used in the same position on each floor. Worker-scan master the construction technigues quickly with minimal training, as the installationanddismantling processes require only manpower, no additional machinery, making opera-tionssimple and convenient.
High Turnover Number and Cost-Efficiency
The aluminum alloy formwork and support systems utilize a set that can be sliahtly modifed-and reused in subseauent new constructions, thus providina a lona-term reduction inform-work cost distribution, The waste from aluminum alloy fommworks is fully recycable.
Rapid Construction Progress and Shorter Project Duration
Aluminum alloy formwork systems are produced and standardized in factories, makinaassem-bly simple and convenient, thereby reducing installation and dismantling time. Thesystem’sspecially designed support structure achieves mature early-stripping technology,which hasbeen accepted and successfuly used wordwide, typically achievina constructiolprogress ofone floor every four to five days.
















